HIRE BOAT No4 – AQUA LEVEN
The fitout on Aqua Leven is already well underway, the boat has had the windows,ballast, flooring, battens, sprayfoam, wiring tails and lining installed. Bulkheads are currently being cut and fitted. The boat will be our first reverse layout in the fleet, this layout was chosen after numerous requests for our hirers. I think it will prove popular choice, we’ve already had 6 weeks booked and it’s only been on the main website for a week. I’ll try my best to keep the blog updated with the fitout. Here’s some photos of progress to date;
Above – Windows in place.
Above – Josh our new apprentice helping to cut back areas of sprayfoam insulation.
Above – Tidying up afterwards
Above – Roof panels being temporarily held in place with ‘sprags’
Above – Wiring looms in place and cabin side paneling in place. The fitout is in Oak.veneered ply and solid oak.
Leave a comment
Archive
- January 2012 (2)
- September 2011 (1)
- August 2011 (2)
- July 2011 (2)
- May 2011 (1)
- March 2011 (1)
- February 2011 (1)
- January 2011 (3)
- December 2010 (1)
- November 2010 (1)
- October 2010 (1)
- August 2010 (2)

